Architectural solutions
We are very happy when architects include photovoltaic elements in their work. This means that solar energy occupies a position in the construction industry.
In this project we had to produce custom panels to fit the space provided. We had to place the order before the construction of the building to include the production time, delivery period, etc. The installation of the photovoltaic system had a certain deadline. This is not easy to plan, given the energy problems in China, where the manufacturer is located, the difficulties of maritime transport.
To predict the exact size BEFORE the building was built meant to count on the builder to follow the project to the millimeter. And we are very happy to see how everything is arranged.
This entry was posted onThursday, November 18th, 2021 at 1:18 pm and is filed under news. You can follow any responses to this entry through the RSS 2.0 feed. You can leave a response, or trackback from your own site. Both comments and pings are currently closed.